PROJECTS

BUILDING COMPLEX ADK HOSPITALS, MALDIVES
Previous
Next

Building Complex for
ADK Hospitals,
Maldives

Master plan of the ADK Hospital encompasses three building complexes covering the entire hospital premises, with each redeveloped building integrated as a component of the overall plan, supporting the requisite technical services. The hospital include modern operating theater complex with three modular units and all related facilities such as a central sterile services department, recovery unit, anesthetic area and catheterization laboratory with staff and supply areas as well as all allied services including the OT lighting and air conditioning systems, water supply and drainage facilities, and requisite supplies such as medical gasses, oxygen supply, anesthetic gasses and interconnected scavenger systems necessary to perform surgeries.  The hospital also comprises a nine storied inpatient department including a special facility for geriatrics in line with changing international healthcare trends and the latest technologies.

ECL provided architectural, structural and building services designs including air conditioning and fire detection systems and landscaping. Services also included preparation of bill of quantities, specifications, tender documentation, assisting the client during tender and negotiation, project management, construction supervision, and payment certification.