Khulhudhufushi Island Sewerage Project
Hdh. Khulhudhufushi Island Sewerage Project, Phase 1
Client: Ministry of Environment Energy and Water Maldives
Client Address: Ministry of Environment Energy and Water, Malé, Maldives
Source of Funding: -
Approx. Value Contract: MRfs 25 million
Approx. Value of Services: MRfs 4. 09 million
Location: Malé, Maldives
Start Date: May 2008
End Date: March 2010
Duration of Assignment: 20 months
Name of Associated Consultants: Altec Pvt. Ltd., Maldives
Description of the Project: Project to implement sewerage project in Hdh. Khul dhufushi Island to serve 5,000 families and local businesses, comprising, primary and secondary sewage collection lines extending in 10 collector zones, 10 pumping station, a treatment plant and safe disposal of treated affluent to sea, sludge drying beds, sea outfall.
Scope of Work: ECL assisted the Client in the implementation the construction programme and included, tender evaluation, assistance for selection of contractors for civil and electro mechanical works, tender negotiations & award, and construction supervision. As the Client’s representative / Engineer, the responsibilities of ECL staff included, (a) checking and approving contractor’s method statement and construction drawings, (b) verification contractor’s setting out of work, quality assurance procedures adopted, (c) monitoring progress of work and advise client on shortfalls and proposed remedial measures, (d) conduct progress review at site, (e) verification of arrival and use of construction materials, machinery and equipment at site, (f) verification and certification of contractor’s monthly invoices and claims, (g) verification of variation claims, (h) ensuring safety at site, (i) ensuring contractor’s activities of the with Maldives environmental regulations, (j) checking the “As Built” drawings prepared by the Contractor, (k) preparation of O&M manual for the project, (l) preparation month, quarterly progress reports, (m) assist the client in testing & commissioning the system, taking over the constructed system and (n) assisting the Project Director to monitor system during defect liability period.