Arugam Bay Bridge
USAID-funded Tsunami Reconstruction Project – Arugam Bay Bridge Replacement and Access Roads Component
Client: Road Development Authority
Client Address: Sethsiripaya, Battaramulla, Sri Lanka
Source of Funding: USAID
Approx. Value Contract: USD 2.5 million
Approx. Value of Services: USD 292,500
Location: Eastern Province
Start Date: November 2005
End Date: November 2008
Duration of Assignment: 36 months
Name of Associated Consultants: Ch2mHill USA
Description of the Project: Feasibility study, preliminary design, procurement, and construction supervision of the Arugam Bay bridge including approach roads, comprising a 160 m composite steel bridge and a 25 m secondary composite steel bridge
Scope of Work:
  • Carried out the feasibility study, supervised geotechnical investigations and topographical surveys and a detailed hydrological study of the area
  • Assisted in developing a design criteria for the main and secondary bridges and road works
  • Prepared conceptual and detail designs, estimates, contract drawings for secondary bridge and road works and tender documents for ICB tendering › Assisted in ensuring the 160 m bridge detail designs are in conformity with the Road Development Authority standards & regulations
  • Carried out construction supervision and management of the project
  • Carried out handing over and supervision of defects rectification